Client: Harju Elekter Group AS
General Contractor: NOBE
Building type: Industrial buildings
Country: Estonia
Time of Completion: 2026
NOBE constructed a nearly 4,000 m² extension to Harju Elekter’s production facility, increasing the company’s capacity and efficiency in manufacturing concrete substations and enabling the production of modular E-house power distribution solutions.
The new facility features larger, more modern production areas with increased lifting capacity, dedicated chambers for waxing and IP testing, and separate spaces for noisy operations. The extension also improves loading conditions both indoors and outdoors, while providing employees with more spacious changing facilities and additional workspaces.
The main challenge of the project was connecting the new building to the existing factory, which remained fully operational throughout the construction period. This required careful planning and coordination to maintain normal working conditions at the factory, even during winter, while keeping construction dust and noise under control.