

Client: Vestas Wind Systems A/S
Building type: Energy Infrastructure
Country: Lithuania
Year: 2025
The Akmenė II Wind Farm in Lithuania forms part of the region’s growing renewable energy infrastructure. Commissioned by Vestas Wind Systems A/S, the project was delivered with NOBE’s contribution in 2025.
NOBE carried out the earthworks and concrete works required for the wind turbine foundations, ensuring compliance with stringent technical requirements. The project was executed with a strong focus on precision, quality, and long-term reliability, all of which are essential for the successful operation of modern wind turbines.
The Akmenė II Wind Farm contributes to the expansion of renewable energy production in the region and supports the transition towards a more sustainable energy system.

